Three phase load current equipment
Complete solution for high current switching tests
For high current switching tests we offer this kind of equipment. This system consists out of a thyristor control unit, the load banks (including resistors and coils), a high current transformer (normally with middle voltage input) and an analyzer.
We can offer equipment depending on the power supply at our customers up to 100 kA.
The software offers the possibility to edit the test sequence. Starting with some security functions, the system synchro-
nizes to the supply signal. The current starts at the defined phase angle. The analyzer and additional equipment like high speed cameras can be controlled.
The stored values can be displayed on the screen and some calculation functions help to analyze them.